题目内容 (请给出正确答案)
[主观题]

70The critical path is calculated by A.subtracting the end date of task one from the start

70 The critical path is calculated by

A. subtracting the end date of task one from the start date of task two.

B. determining which tasks have the least amount of total slack.

C. totaling the time for all activities.

D. determining the shortest path through the network.

E. Determining which tasks have the most slack

提问人:网友dongwen_wen 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“70The critical path is calcula…”相关的问题
第1题
In a double-entry accounting system, the total amount debited must always equal the total amount credited.
点击查看答案
第2题
The price elasticity of demand is calculated as the absolute value of the
A.percentage change in quantity demanded divided by the percentage change in price

B.percentage change in price divided by the percentage change in quantity demanD

C.change in quantity demanded divided by the change in price

D.change in price divided by the change in quantity deman

D.

点击查看答案
第3题
The main reason for this increase in life expectancy is the improvement in living standards.
点击查看答案
第4题
114 The appointment or selection of a project sponsor is often based upon:

A. The strategic importance of the project

B. Who the customer is

C. Whether the organization is project or non-project-driven

D. The profitability of the project

E. All of the above

点击查看答案
第5题
116 When all members must unanimously agree before a decision is reached

A. all members become committed

B. decisions are reached slowly

C. integrity is developed

D. future decision making ability is enhanced

E. All of the above

点击查看答案
第6题
168 A work breakdown structure:

A. assures all work is identified.

B. subdivides the project into manageable segments.

C. provides the project sponsor with a time-phase task summary.

D. both A and B.

E. All of the above.

点击查看答案
第7题
● Using the WBS shown in the Special window, a typical work package would be:

A Software development

B Systems design

C Coding

D A, B, and C

E None of the above.

点击查看答案
第8题
● The project charter is a document designed to tell _____ exactly what the project entails.

A The project manager

B The project office

C The project team

D The project sponsor

E Anyone associated with the project

点击查看答案
第9题
● Using the figure in the Special window, The slacktime in Activity "G" is _____ weeks.

A 2

B 3

C 4

D 5

E 7

点击查看答案
第10题
●按照系统安全等级中的可靠性等级由高到低分别为(29)。

(29) A.绝密、机密、秘密 B.军用、商用、民用

C.A 级、B 级、C 级 D.使用级、修改级、控制级

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信