题目内容 (请给出正确答案)
[主观题]

● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a ne

gative effect on at least one project objective, such as time, cost, scope, or quality.

(71)

A.risk

B.problem

C.result

D.data

提问人:网友zhaodanyy 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“● Project(71)is an uncertain e…”相关的问题
第1题
听力原文: A birth defect intervention project began on Tuesday in North China's Shanxi Province, targeting a reduction in the high rate of birth defects in some parts of the province.

With the country's average rate of such defects in the past two decades at 1.3 per cent, the rate in Shanxi Province remains at 1.8 per cent, according to statistics. The rate in some mountain areas in the province has reache & an alarming 4 to 6 per cent.

Experts believe the high rate of birth defects there is related to a lack of basic vitamins for women in the early stages of their pregnancies. An ample vitamin supply has been show a by scientists to be important to proper embryonic development, which can reduce the rate of some birth defects and improve the quality of births.

To improve the nutritional conditions for local people, the project plans to add vitamins into flour, a staple food in the area. The nutrients to be added will be provided by various international organizations. The project has gained support from the World Health Organization, United Nations Children's Fund, and International Life Science Institute.

It is expected that by next January that flour with the added nutrients will be given to an estimated 250,000 residents.

And inspection and evaluation will be carried out along with the project, and successful experiences will be extended to areas with similar situations.

The project is sponsored by Shanxi provincial government and the country's Healthy Baby Promotion Programme.

In the past two decades, the rate of birth defects in Shanxi Province is higher than the country's average by__________.

A.0.3

B.0.5

C.0.6

D.0.8

点击查看答案
第2题
● (73)is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.

(73)

A. Quality assurance (QA)

B. Quality planning

C. Quality control (QC)

D. Quality costs

点击查看答案
第3题
●The project manager must maintain an effective communication link with the customer's satisfaction with the progress of the project. The project manager maintains this link through (71).

(71)

A.periodic project reports, periodic visits to the customer, and telephonic exchanges

B.subordinates, project team members, and the project sponsor

C.one-time reports, weekly reports, and monthly reports

D.the telephone, facsimile, and data transmission

点击查看答案
第4题
● The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such, the schedule is used by the project management team to (73) .

(73)

A. measure, delay, record, distribute, analyze, and direct

B. plan, schedule, monitor, control, report, and forecast

C. promote, highlight, monitor, control, forecast, and report

D. emphasize, visualize, analyze, conceptualize, report, and record

点击查看答案
第5题
● 以互联网为基础,将数字化、智能化的物体接入其中,实现自组织互联,是互联网的延伸与扩展;通过嵌入到物体上的各种数字化标识、感应设备,如RFID标签、传感器、响应器等,使物体具有可识别、可感知、交互和响应的能力,并通过与Internet的集成实现物物相联,构成一个协同的网络信息系统。以上描述的是__(5)__。

(5)A.智慧地球 B.三网融合 C.SaaS D.物联网

点击查看答案
第6题
Estimating schedule activity costs involves developing an (74) of the cost of the resources needed to complete each schedule activity.

A.accuracy

B.approximation

C.specification

D.summary

点击查看答案
第7题
某单位依据《电子信息系统机房设计规范GB 50174-2008》设计该单位的机房,在该单位采取的下述方案中,______是不符合该规范的。

A.整个机房由主机房、辅助区、支持区和行政管理区等四个功能区组成

B.主机房内计划放置15台设备,设计使用面积65平米

C.除主机房外,还设置了辅助区,辅助区面积是主机房面积的10%

D.主机房设置了设备搬运通道、设备之间的出口通道、设备的测试和维修通道

点击查看答案
第8题
某计算机系统集成二级企业注册资金2500万元,从事软件开发与系统集成相关工作的人员共计100人,其中项目经理15名,高级项目经理10名。该企业计划明年申请计算机信息系统集成一级企业资质,为了符合评定条件,该企业在注册资金、质量管理体系或人员方面必须完成的工作是______。

A.注册资金增资

B.增加从事软件开发与系统集成相关工作的人员数

C.增加高级项目经理人数

D.今年通过CMMI 4级评估

点击查看答案
第9题
小张草拟了一份信息系统定制开发合同,其中写明“合同签订后建设单位应在7个工作日内向承建单位支付60%合同款;系统上线并运行稳定后,建设单位应在7个工作日内向承建单位支付30%合同款”。上述条款中存在的主要问题为______。

A.格式不符合行业标准的要求

B.措辞不够书面化

C.条款描述不清晰、不准确

D.名词水语不规范

点击查看答案
第10题
在没有路由的本地局域网中,以Windows操作系统为工作平台的主机可以同时安装______协议,其中前者是至今应用最广的网络协议,后者有较快速的性能,适用于只有单个网络或桥接起来的网络。

A.TCP/IP和SAP

B.TCP/IP和IPX/SPX

C.IPX/SPX和NETBEUI

D.TCP/IP和NETBEUI

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信