● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a ne
(71)
A.risk
B.problem
C.result
D.data
(71)
A.risk
B.problem
C.result
D.data
With the country's average rate of such defects in the past two decades at 1.3 per cent, the rate in Shanxi Province remains at 1.8 per cent, according to statistics. The rate in some mountain areas in the province has reache & an alarming 4 to 6 per cent.
Experts believe the high rate of birth defects there is related to a lack of basic vitamins for women in the early stages of their pregnancies. An ample vitamin supply has been show a by scientists to be important to proper embryonic development, which can reduce the rate of some birth defects and improve the quality of births.
To improve the nutritional conditions for local people, the project plans to add vitamins into flour, a staple food in the area. The nutrients to be added will be provided by various international organizations. The project has gained support from the World Health Organization, United Nations Children's Fund, and International Life Science Institute.
It is expected that by next January that flour with the added nutrients will be given to an estimated 250,000 residents.
And inspection and evaluation will be carried out along with the project, and successful experiences will be extended to areas with similar situations.
The project is sponsored by Shanxi provincial government and the country's Healthy Baby Promotion Programme.
In the past two decades, the rate of birth defects in Shanxi Province is higher than the country's average by__________.
A.0.3
B.0.5
C.0.6
D.0.8
(73)
A. Quality assurance (QA)
B. Quality planning
C. Quality control (QC)
D. Quality costs
(71)
A.periodic project reports, periodic visits to the customer, and telephonic exchanges
B.subordinates, project team members, and the project sponsor
C.one-time reports, weekly reports, and monthly reports
D.the telephone, facsimile, and data transmission
(73)
A. measure, delay, record, distribute, analyze, and direct
B. plan, schedule, monitor, control, report, and forecast
C. promote, highlight, monitor, control, forecast, and report
D. emphasize, visualize, analyze, conceptualize, report, and record
(5)A.智慧地球 B.三网融合 C.SaaS D.物联网
A.accuracy
B.approximation
C.specification
D.summary
A.整个机房由主机房、辅助区、支持区和行政管理区等四个功能区组成
B.主机房内计划放置15台设备,设计使用面积65平米
C.除主机房外,还设置了辅助区,辅助区面积是主机房面积的10%
D.主机房设置了设备搬运通道、设备之间的出口通道、设备的测试和维修通道
A.注册资金增资
B.增加从事软件开发与系统集成相关工作的人员数
C.增加高级项目经理人数
D.今年通过CMMI 4级评估
A.格式不符合行业标准的要求
B.措辞不够书面化
C.条款描述不清晰、不准确
D.名词水语不规范
A.TCP/IP和SAP
B.TCP/IP和IPX/SPX
C.IPX/SPX和NETBEUI
D.TCP/IP和NETBEUI
为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!