Schedule control is concerned with all the following except ()A.influencing the factors t

Schedule control is concerned with all the following except ()

A.influencing the factors that create schedule changes to ensure that the changes are beneficial

B.determing that the schedule has changed

C.managing the actual changes when and as they occur

D.changing the shedule based on customer demands

提问人:网友baoguilv 发布时间:2022-01-06
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“Schedule control is concerned …”相关的问题
第1题
The Work Breakdown Structure (WBS) is the basis for communicating:A.Project scope, cost co

The Work Breakdown Structure (WBS) is the basis for communicating:

A.Project scope, cost control, schedule, quality

B.Project objectives, dependencies, plan, cost control

C.Project scope, schedule, staffing, cost control

D.Project scope, quality, schedule, dependencies

E.Project budget, schedule, risk factors, work assignments.

点击查看答案
第2题
2The Work Breakdown Structure (WBS) is the basis for communicating: A.Project scope, cost

2 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments

点击查看答案
第3题
Schedule control is concerned with all the following except (74)A.influencing the factors

Schedule control is concerned with all the following except (74)

A.influencing the factors that create schedule changes to ensure that the changes are beneficial

B.determing that the schedule has changed

C.managing the actual changes when and as they occur

D.changing the shedule based on customer demands

点击查看答案
第4题
The intention of the__(75)__is to schedule,organize and control all activities to achieve

The intention of the__(75)__is to schedule,organize and control all activities to achieve the project goal eventually.No matter how difficult it is and what kind of risks are ther

A.

B.project work breakdown

C.project security authentication

D.project management

E.project flowchart

点击查看答案
第5题
120The Work Breakdown Structure (WBS) is the basis for communicating: A.Project scope, cos

120 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments

点击查看答案
第6题
Configuration (baseline) control monitors performance against theAscope baselineBoriginal

Configuration (baseline) control monitors performance against the

Ascope baseline

Boriginal schedule

Coriginal budget

DAll of the above.

ENone of the above.

点击查看答案
第7题
The schedule management plan is a component of the project management plan The schedule
management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.

A.goals

B.values

C.needs

D.Level

点击查看答案
第8题
The work breakdown structure (WBS) is an excellent tool for objective control and evaluati

The work breakdown structure (WBS) is an excellent tool for objective control and evaluation. Which of the following is generally NOT validated through the WBS?

A.Time, schedule and cost.

B.Management coordination and organization structuring.

C.Work methods and accountability.

D.Quality of work.

E.Risk and impact decision-making.

点击查看答案
第9题
183Configuration (baseline) control monitors performance against the A.scope baseline B.or

183 Configuration (baseline) control monitors performance against the

A. scope baseline

B. original schedule

C. original budget

D. All of the above.

E. None of the above

点击查看答案
第10题
In performing an impact analysis, the most effective tool to ensure all risks are identifi
ed on large projects is the:

A Work breakdown structure

B milestone review and schedule technique

C cost/schedule control system

D planning programming budget system

E program and evaluation review technique

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信