![](https://lstatic.shangxueba.com/jiandati/h5/images/m_q_title.png)
● The TCP protocol is a (72) layer protocol.(72) A. physical B. network C. transport D. ap
● The TCP protocol is a (72) layer protocol.
(72) A. physical
B. network
C. transport
D. application
● The TCP protocol is a (72) layer protocol.
(72) A. physical
B. network
C. transport
D. application
原文: All disputes in connection with this contract or the execution thereof shall be amicably settled through negotiations. In case no settlement can be reached between the two parties, the cases under dispute shall be submitted for arbitration, which shall be held in a third country agreed by both parties. The arbitral award shall be taken as final and binding upon both parties. The arbitration fees shall be borne by the losing party. 译文: A.凡因与本合同或执行本合同时所发生的一切争议,应由双方通过友好协商加以解决;如协商不能得到解决,应交由仲裁。仲裁应在双方接受的第三国中进行,其裁决为最终裁决且对双方都有约束力。仲裁费用应由败诉方承担。 B.凡因执行本合同所发生或与本合同有关的一切争议,应由双方通过友好协商加以解决;如协商不能得到解决,应将争议提交仲裁。仲裁应在双方同意的第三国进行,其裁决应对双方具有最终约束力。仲裁费应由败诉方承担。
A、链路的建立
B、链路的维护
C、链路的终止
D、链路的建立、维护和终止
(5)A.循环0次、循环1次、循环99次、循环100次
B.循环0次、循环100次、循环49次、循环50次
C.循环1次、循环99次、循环49次、循环50次
D.循环0次、循环100次
(23)A.Web Services 和EJB B.EJB 和JSP
C.JSP和EJB D.JNDI和JSP
(20)A.200 B.100 C.50 D.25
①概述 ②需求确定 ③现有资源 ④技术方案 ⑤进度计划
⑥项目组织 ⑦效益分析 ⑧协作方式 ⑨结论
该报告中欠缺的必要内容是__(37)__。
(37)A.应用方案 B.质量计划
C.投资估算 D.项目评估原则
(38)A.对项目的绩效情况进行分析,确定是否偏离设定的范围基准
B.对详细的范围说明书进行评审,提交客户签字确认
C.与客户充分沟通以获取项目的详细需求
D.与客户开展审查或检查活动,判断工作和交付成果是否符合设定的标准
(56)A.投资收益率法 B.投资回收期法
C.追加投资回收期法 D.内部收益率法