题目内容 (请给出正确答案)
[单选题]

BIM全称Building Information Modeling()。

A.建筑信息模型

B. 建筑信息模型化

C. 建筑模型信息

D. 以上均对

提问人:网友greatoa1 发布时间:2022-01-06
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
网友答案
查看全部
  • · 有5位网友选择 B,占比62.5%
  • · 有2位网友选择 A,占比25%
  • · 有1位网友选择 D,占比12.5%
匿名网友 选择了B
[92.***.***.127] 1天前
匿名网友 选择了B
[7.***.***.138] 1天前
匿名网友 选择了B
[45.***.***.78] 1天前
匿名网友 选择了A
[72.***.***.241] 1天前
匿名网友 选择了B
[132.***.***.23] 1天前
匿名网友 选择了D
[40.***.***.84] 1天前
匿名网友 选择了B
[66.***.***.202] 1天前
匿名网友 选择了A
[128.***.***.145] 1天前
加载更多
提交我的答案
登录提交答案,可赢取奖励机会。
更多“BIM全称Building Information Mode…”相关的问题
第1题
建筑信息模型,简称BIM,全称Building Information Model
点击查看答案
第2题
BIM全称Building Information Modeling()

A.建筑信息模型

B.建筑信息模型化

C.建筑模型信息

D.以上均对

点击查看答案
第3题
BIM是Building Information Management的英文简称。
点击查看答案
第4题
BIM的全称是()。

A.Building Information Management

B.Building Information Modeling

C.Building Information Model

D.Build Information Modeling

点击查看答案
第5题

BIM的全称是()。

A. Building Information Modeling

B.Build Information Modeling

C.Building Information Model

D.Biuilding Intelligente Modeling

点击查看答案
第6题
Office Center TowersThis is (144) all tenants that tomorrow morning, May 10th, service wor

Office Center Towers

This is (144) all tenants that tomorrow morning, May 10th, service work will be performed on the building fire alarm system (145) the hours of 9:30 and 10:30. As part of this procedure, it will be necessary to test the alarm and you may hear it (146) three or four times in the course of the morning. Do not be concerned when you hear the alarm go off. It is part of the normal service routine.

If you have any questions, please contact the building superintendent' s office. Thank you for your patience.

(44)

A.informing

B.inform

C.informed

D.to inform

点击查看答案
第7题
1. 如何理解BIM的基本含义? 2 .Building Information Model, Building Information Modeling 和 Building Information Management 的概念区别在哪儿,哪一个的含义范畴最大? 3. BIM技术的基本特点有那些? 4.BIM有哪些应用? 5.BIM未来有哪些发展趋势?
点击查看答案
第8题
A rented out his house and courtyard facing the street to B, and B used it as an automobil
e repair shop. With A’s permission, B expanded, at his own expanses, several houses for automobile painting. When B was submitting an application to the authorities for expanding the building, he found that all the properties A rented out was not approved by the Urban Planning Department, meaning that all are unauthorized construction. Which of the following is true?

A、A、 The lease contract is invalid.

B、B、 A and B shall jointly bear the costs for expanded construction, because both are in fault in doing so.

C、C、 B can cancel the lease contract, because A did not inform B that the house is unauthorized construction.

D、D、 B can continue to perform the contract waiting for the relevant authorities to confirm that the house is unauthorized and affecting his use of the building, then he can claim for liability for breach of contract.

点击查看答案
第9题
国际智慧建筑组织对BIM的定义中“通过使用建筑信息模型内的信息支持项目全生命周期信息共享的业务流程组织和控制过程”指的是()。

A.(Building

B.(Building

C.(Building

D.(Building

点击查看答案
第10题
BIM(Building Information Model)的中文含义是()

A.建筑信息模型

B.建筑模型信息

C.建筑信息模型化

D.建筑模型信息化

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信