![](https://lstatic.shangxueba.com/jiandati/h5/images/m_q_title.png)
Having expected that she would become the mistress of the household and have much more
A.with all efforts
B.through out
C.on both counts
D.at a great loss
A.with all efforts
B.through out
C.on both counts
D.at a great loss
When having dinner, the guests are expected to______.
A.eat their food slowly
B.help the host serve food
C.serve each other at the table
D.help themselves to more food
We ______ having picnic for so long time.
A.have desired
B.have hoped
C.have looked forward to
D.have expected
()everything to go wrong and you won ’t feel quite so bad when it does.
A、Having expected
B、Expected
C、Expecting
D、To expect
A、on both counts
B、in both counts
C、on some counts
D、at a great loss
123 The scope of a project can be expected to change if:
A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs
C. The project manager is assigned after the project is defined, and the cost and schedule are approved D. A clear objective is not provided
E. All of the above are possible based upon the situation
A.higher
B.lower
C.the same
D.The answer cannot be determined from the information given.
A risk-averse individual will______.
A.prefer a riskless security which is certain to pay 5% to a risky security having an expected return of 5%
B.always hold a diversified portfolio of securities
C.never gamble
D.all of the above
The scope of a project can be expected to change if:
A.The project manager must provide cost estimates without having a design concept
B.Oversimplification (underestimating) of the nature of the work occurs
C.The project manager is assigned after the project is defined, and the cost and schedule are approved
D.A clear objective is not provided
E.All of the above are possible based upon the situation
A、He is being praised for having let the dog go out of the house alone.
B、He is being asked to let the dog go out of the house alone.
C、He is being blamed for having let the dog go out of the house alone.
D、He is being expected to find the dog that has gone out of the house alone.
41 The scope of a project can be expected to change if:
A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs
C. The project manager is assigned after the project is defined, and the cost and schedule are approved
D. A clear objective is not provided
E. All of the above are possible based upon the situation
为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!