After a baseline check was completed it was noted that the network was working far below t

helevel of the last baseline.Which of the following should the technician do NEXT to determine where the network problems are occurring?()

A. Upgrade the firmware on all routers and switches

B. Reboot the entire network one device at a time

C. Conduct a network traffic analysis

D. Rerun the baseline to ensure the results were correct

提问人:网友wuqipanyifei 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“After a baseline check was com…”相关的问题
第1题
A project manager believes that modifying the scope of the project may provide added value
for the customer. The project manager should:

A.Change the scope baseline

B.Prepare a variance report

C.Call a meeting of the configuration control board

D.Change the project's objectives

E.Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案
第2题
● A project manager believes that modifying the scope of the project may provide added val
ue service for the customer. The project manager should(75).

(75)

A.assign change tasks to project members

B.call a meeting of the configuration control board

C.change the scope baseline

D.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案
第3题
● A project manager believes that modifying the scope of the project may provide added val
ue service for the customer .The project manager should()()A. assign change tasks to project membersB. call a meeting of the configuration control boardC. change the scope baselineD. postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案
第4题
148A project manager believes that modifying the scope of the project may provide added va

148 A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:

A. Change the scope baseline

B. Prepare a variance report

C. Call a meeting of the configuration control board

D. Change the project's objectives

E. Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案
第5题
66A project manager believes that modifying the scope of the project may provide added val

66 A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:

A. Change the scope baseline

B. Prepare a variance report

C. Call a meeting of the configuration control board

D. Change the project's objectives

E. Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案
第6题
The following command is executed to create the baseline template:Which statement is true about the effect of the above command?()

A. It creates a baseline template that never expires.

B. It produces an error because no snapshot information is provided to create the baseline.

C. It creates a baseline template that expires after the Automatic Workload Repository (AWR) retention period.

D. It creates a repeating baseline template that repeats after the Automatic Workload Repository (AWR) retention period.

点击查看答案
第7题
156During project execution, the customer authorizes and funds a scope change which requir

156 During project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. The baseline schedule:

A. Now becomes the new schedule, including the changes, and the original baseline is disregarded. B. Is still the original baseline but annotated to reflect that a change has taken place.

C. Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.

D. Is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)

E. Is the same since baseline schedules cannot change once the development phase is completed

点击查看答案
第8题
38During project execution, the customer authorizes and funds a scope change which require

38 During project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. The baseline schedule:

A. Now becomes the new schedule, including the changes, and the original baseline is disregarded. B. Is still the original baseline but annotated to reflect that a change has taken place.

C. Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.

D. Is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)

E. Is the same since baseline schedules cannot change once the development phase is completed

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信