题目内容 (请给出正确答案)
[主观题]

A. Management Trainee 1. No major restriction, graduate students of Top Universities in Ch

A. Management Trainee

1. No major restriction, graduate students of Top Universities in China who are in Grade Two are preferred.

2. Good communication and coordinate skills, high teamwork spirit, ability to work under pressure and to solve problems.

3. Strong organizing and planning skills and ability to set priorities, independent and hard working, eager to learn.

4. Self-motivated individual with clear personal and professional goals.

5. Proficiency in both written and spoken Mandarin and English.

6. Proficiently use office software (Word, Excel, Power Point, etc.).

B. IT Supporter

1. Good written and oral English. At least CET-6.

2. Should have an IT background.

3. Have a good command on web page design, which is the most important of all.

4. And also should have some experience on database, for we need you to build a database collection system.

C. Office Administrator

1. University degree in Administration or relevant disciplines.

2. Fluent in both oral and written English, CET-6 certificate holder is preferred.

3. Extensive knowledge of business English, spelling, punctuation, and arithmetic, modern office.

4. Must be able to apply modern secretarial techniques and practices in completing work assignments.

5. Mature and strong, independent working capability.

6. Bright and energetic attitude towards work, and self-starter with amazing creativity.

7. Self-confidence, self-esteem with strong interpersonal skills.

8. Flexible and open-minded, team-working spirit, can work under pressure.

9. Good command of computer knowledge—Word, Excel, Power Point, Outlook, etc.

D. Public Relations Assistant

1. 2nd year graduate.

2. Media, English Major or Chinese Major with good English.

3. Relevant intern experience expected.

4. Actively participate in extracurriculum.

The job requires the applicants to pass CET-

提问人:网友hunter321 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“A. Management Trainee 1. No ma…”相关的问题
第1题
It (soon) became (obviously) that (instead of) (being trained) to sing she would be traine

It (soon) became (obviously) that (instead of) (being trained) to sing she would be trained as a dancer.

A.soon

B.obviously

C.instead of

D.being trained

点击查看答案
第2题
The best conclusion we can draw from the passage is that ______.A.parents should be traine

The best conclusion we can draw from the passage is that ______.

A.parents should be trained to read to their children

B.the more children read, the more intelligent they will become

C.children's language skills increase when they are required to respond actively

D.children who read actively seem six months older

点击查看答案
第3题
下列表示运筹学的英文词汇是()。 A. Operations Research B. Operations Management C. Operational Management D. Operational Research

A、A. Operations Research

B、B. Operations Management

C、C. Operational Management

D、D. Operational Research

点击查看答案
第4题
What is PDM?()

A. Production distribution management

B. Physical distribution management

C. Processing distribution management

D. Pallets distribution management

点击查看答案
第5题
财务管理(Financial Management)与公司财务(Corporate Finance)是相同的概念。

A.错误

B.正确

点击查看答案
第6题
● (74) is primarily concerned with defining and controlling what is and is not included in

● (74) is primarily concerned with defining and controlling what is and is not included in the project.

(74)

A. Project Time Management

B. Project Cost Management

C. Project Scope management

D. Project Communications Management

点击查看答案
第7题
The primary objective of information flow management is to reconcile these differentials t
o improve overall supply chain performance.()

A.正确

B.错误

点击查看答案
第8题
Unluckily some Quality Management System failures()headlines.A. do makeB. does makeC.

Unluckily some Quality Management System failures()headlines.

A. do make

B. does make

C. do not make

点击查看答案
第9题
25In which of the following scope management processes is the scope management plan prepar

25 In which of the following scope management processes is the scope management plan prepared? A. Initiation

B. Scope planning

C. Scope Definition

D. Scope change control

E. Scope verification

点击查看答案
第10题
In large firms the management deals with the daily running of the firm.A.正确B.错误

In large firms the management deals with the daily running of the firm.

A.正确

B.错误

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信