108The way a project manager sends and receives information depends upon: A.How others rel

108 The way a project manager sends and receives information depends upon:

A. How others relate to the project manager

B. The project manager's level in the organizational hierarchy

C. the size and nature of the project

D. the project manager's salary and age

E. the number of projects going on at one time in the company

提问人:网友linux5151 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“108The way a project manager s…”相关的问题
第1题
To illustrate how critical CSR has become, a 2017 study by Cone Communications found that more than 16 percent of Americans hope businesses will drive social and environmental change in the absence of government regulation.
点击查看答案
第2题
_________ is moving to the center of concern in translation studies.
点击查看答案
第3题
Price paved the way for future scientometric research, including:

A、growth model

B、studied scientometric transactions

C、impact factor

D、citation network

点击查看答案
第4题
Children often become surrogate mothers to abandoned animals.

A、substitute

B、temporal

C、affectionate

D、step-

点击查看答案
第5题
阅读理解。????In Kansas City,Missouri, a computer h...
阅读理解。
In Kansas City,Missouri, a computer helps firefighters. The computer keeps information about every one

of the 350 000 street addresses in the city. When firefighters answer a call,the computer will give them

important information about the burning building: its position, size and so on. In fact, the computer system has

a lot of ways of helping firefighters with the problems facing them. For example, it can give medical information about invalids (伤残者) living in a burning building. With this information, the firefighters can take special care

to find these sick persons and save them. The Kansas City computer system also keeps a medical record of

each of the city's 900 firefighters. This kind of information is especially useful when a fireman is injured. With

this medical information, doctors can treat the injured firefighters more quickly and easily.

The firefighters themselves need the computer's help. They know about possible dangers and prepare for

them. Many times the computer information helps to save lives and property. Sometimes the lives are those of

firefighters themselves!

1. Missouri is most likely the name of _____.
A. a street where firefighters work

B. a city smaller but more famous than Kansas

C. one of the states of America

D. the centre of the computer system

2. The computer can give ____.
A. all useful information about the city

B. good information about everybody in the city

C. useful information about every street address in the city

D. nice pictures about each building on fire

3. The computer system can _____.
A. give the firemen important help in many ways

B. have a few ways of helping the firefighters

C. hardly give any useful information for the firefighters

D. put out every fire quickly and safely

4. The firefighters know that the invalids in a burning building _____.
A. will not save themselves

B. want information from the computer

C. cannot see the dangers

D. need special help

点击查看答案
第6题
114 The project manager must receive reports and briefings from engineers, contracting officers, procurement personnel and marketing people. The project manager's communication dilemma is one of:

A. encoding

B. decoding

C. choice of a medium

D. one-way communication

E. All of the above.

点击查看答案
第7题
134 Assignable cause or special variation is:

A. is indicated when a point falls outside the control limits.

B. is indicated when a point falls outside the specification limits.

C. is indicated when a run of seven or more points fall above the center line of a standard control chart.

D. is indicated when a run of seven or more points fall below the center line of a standard control chart.

E. A, C, and D

点击查看答案
第8题
153 To determine what causes the majority of quality problems in a process, a very useful tool is the: A. cause and effect diagrams.

B. flow chart.

C. control chart.

D. pareto chart.

E. trend chart

点击查看答案
第9题
199 Which method shown below is acceptable for reducing cost or shortening the schedule? A. "Crashing"

B. Changing scope.

C. Performing activities in parallel rather than in series.

D. All of the above.

E. A and C only

点击查看答案
第10题
198 The most effective means of determining the cost of a project is to price out the _____.

A. Work breakdown structure.

B. Linear responsibility chart.

C. Project charter.

D. Scope statement.

E. Management plan

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信