题目内容 (请给出正确答案)
[多选题]

What information can you specify in a quota arrangement? There are 2 correct answers to this question.()

A.A quota you want to assign to the source

B.An info record number for external procurement requirements

C.An outline agreement number for external procurement requirements

D.A procurement type for each source

提问人:网友陈银桑 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
网友答案
查看全部
  • · 有3位网友选择 C,占比30%
  • · 有2位网友选择 AC,占比20%
  • · 有1位网友选择 BC,占比10%
  • · 有1位网友选择 D,占比10%
  • · 有1位网友选择 AD,占比10%
  • · 有1位网友选择 BD,占比10%
  • · 有1位网友选择 ABC,占比10%
匿名网友 选择了C
[109.***.***.122] 1天前
匿名网友 选择了BD
[134.***.***.80] 1天前
匿名网友 选择了C
[109.***.***.54] 1天前
匿名网友 选择了C
[29.***.***.254] 1天前
匿名网友 选择了AC
[37.***.***.214] 1天前
匿名网友 选择了AC
[31.***.***.173] 1天前
匿名网友 选择了BC
[239.***.***.112] 1天前
匿名网友 选择了D
[140.***.***.93] 1天前
匿名网友 选择了AD
[25.***.***.23] 1天前
匿名网友 选择了ABC
[210.***.***.177] 1天前
加载更多
提交我的答案
登录提交答案,可赢取奖励机会。
更多“What information can you speci…”相关的问题
第1题
What can you define for a movement type in Customizing? There are 2 correct answers to this question.()
A.The reversal movement types for a movement type

B.The transactions in which a movement type can be used

C.The number range for material documents that are generated when postings are made with a movement type

D.The quantity and value updates for postings with a movement type

点击查看答案
第2题
What can you define for a movement type in Customizing? There are 3 correct answers to this question.()
A.The quantity and value updates for postings with the movement type

B.The number range for material documents that are generated when postings are made with the movement type

C.The movement type short text and the reasons for movement

D.The account modification for transactions and events with active account grouping in the table of account keys

E.The indicator for automatic creation of storage location data in the material master record at the time of the first goods receipt

点击查看答案
第3题
What can you derive from the purchase order structure in the invoice verification transaction MIRO (Enter Invoice)? There are 2 correct answers to this question.()
A.Whether blocked invoices exist for a purchase order item

B.The total of open items for a vendor in the current invoice

C.Whether there is a different invoicing party in the purchase order for this invoice

D.Whether the goods receipt for a purchase order item was posted as valuated or non-valuated

E.Whether there were return deliveries for a purchase order item

点击查看答案
第4题
What options do you have after entering a physical inventory count for a raw material? There are 3 correct answers to this question.()
A.You can initiate a recount

B.You can post the inventory difference, whereby only an accounting document is created in the background

C.You can post an inventory difference, whereby a material document and an accounting document are created in the background

D.You can print a list of differences to determine the materials you have to recount

点击查看答案
第5题
You convert a purchase requisition to a purchase order.What can you assign to the purchase requisition to be used as a source of supply in SAP Materials Management? Note: There are 2 correct answers to this question.()

A.Desired vendor

B.Quota arrangement

C.Info record

D.Contract

点击查看答案
第6题
What are the options to post inventory differences depending on the processing status of the physical inventory transaction? There are 3 correct answers to this question.()
A.You only post the differences since the physical inventory document has already been created and the count has already been posted

B.You have to initiate a recount for zero counts before you can post the differences if a physical inventory document has already been created, and the count has already been posted

C.You enter the count and post the differences in one step if a physical inventory document has been created

D.You only have to create a physical inventory document with reference to the count and post the differences in one step if the count has already been posted

E.You create a physical inventory document, enter the count, and post the differences in one step

点击查看答案
第7题
What can you change in a material document after it has been posted? Please choose the correct answer.()
A.The quantity at item level

B.The text at item level

C.The vendor delivery note number in the document header

D.The stock type at item level

点击查看答案
第8题
The main dish in the western countries is usually sliced and chopped up meat.
点击查看答案
第9题
What can you specify when you assign a message schema to an application in Purchasing? Please choose the correct answer.()
A.The permitted output media, for example print output or fax

B.The access sequence for the message types

C.The number of outputs for print messages

D.That a new message determination process is initiated for change messages

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信