题目内容 (请给出正确答案)
[主观题]

If control risk and inherent risk are assessed as sufficiently low, substantive procedures can be abandoned completely.

提问人:网友jackieyin 发布时间:2022-01-07
参考答案
  抱歉!暂无答案,正在努力更新中……
如搜索结果不匹配,请 联系老师 获取答案
更多“If control risk and inherent r…”相关的问题
第1题
control risk is related to internal control
点击查看答案
第2题
An increased extent of tests of controls is most likely to occur when

A、it is a first-year audit.

B、the auditor is doing a "fraud audit."

C、controls are effective and the preliminary control risk assessment is low.

D、controls are ineffective and the preliminary control risk assessment is high.

点击查看答案
第3题
The()process ascertains which risks have the potential of affecting the project and doc
umenting the risks’characteristics. A.Risk Identification B.Quantitative Risk Analysis C.Qualitative Risk Analysis D.Risk Monitoring and Control

点击查看答案
第4题
Without an effective ________, the other components of the COSO framework are unlikely to result in effective internal control, regardless of their quality.

A、risk assessment policy

B、monitoring policy

C、control environment

D、system of control activities

点击查看答案
第5题
The risk of material misstatement refers to

A、control risk and acceptable audit risk.

B、inherent risk.

C、the combination of inherent risk and control risk.

D、inherent risk and audit risk.

点击查看答案
第6题
Control method in supply chain risk management means avoiding, avoiding and giving up risks so as to reduce or eliminate the infringement of risks and reduce or avoid losses.
点击查看答案
第7题
The government is ______ and will take the necessary steps to maintain security and stabil
ity.

A.on standby

B.at risk

C.out of control

D.on the alert

点击查看答案
第8题
1. What are the two elements of the risk of material misstatement at the assertion level?

A、Inherent risk and detection risk

B、Audit risk and detection risk

C、Inherent risk and control risk

D、Detection risk and control risk

点击查看答案
第9题
The ()process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics.

A.Riskldentification

B.Quantitative Risk Analysis

C.Qualitative Risk Analysis

D.Risk Monitoring and Control

点击查看答案
第10题
The______process ascertains which risks have the potential Of affecting the proect and doc
umenting the risks' characteristics.

A.Risk Identification

B.Quantitative Risk Analysis

C.Qualitative Risk Analysis

D.Risk Monitoring and Control

点击查看答案
第11题

()is the process of implementing risk response plans,tracking identified risks,monitoring residual risk,identifying new risk,and evaluating risk process effectiveness throughout the project.

A.Identity risks

B.Control risks

C.Plan risk responses

D.Plan risk management

A.Identity risks

B.Control risks

C.Plan risk responses

D.Plan risk management

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信