题目内容 (请给出正确答案)
[主观题]

3In order to achieve long-term quality improvements, management must do the following: A.M

3 In order to achieve long-term quality improvements, management must do the following:

A. Motivate the employees with seminars, contests, and institute programs such as "Quality Improvement' day.

B Create a quality control department and give the head of the department ultimate responsibility for quality improvement.

C. Implement of a formal quality control program with worker and management involvement.

D. Establish financial incentive packages for worker.

E. A and D

提问人:网友jjxwhb 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“3In order to achieve long-term…”相关的问题
第1题
A technology upgrading strategy is utilized by incumbent companies in a mature industry to deter entry by investing in costly upgrades that potential entrants would have trouble matching.
点击查看答案
第2题
Which of the following are traditional sources of energy( ).

A、coal

B、oil

C、petroleum

D、hydrogen energy

点击查看答案
第3题
46 Graphical displays of accumulated cost and labor hours, plotted as a function of time, are called: A. Variance reports

B. S curves

C. Trend analysis

D. Earned value reporting

E. Baseline control

点击查看答案
第4题
97 In preparing a good project definition, experienced project managers will:

A. Concentrate mainly on the end product rather than costs or benefits. These come later.

B. Realize that only the "tip of the iceberg" may be showing. As a project manager, you must get beneath it.

C. Understand that a project definition/plan is a dynamic rather than static tool, and thus subject to change.

D. Try to convert objectives into quantifiable terms.

E. All of the above

点击查看答案
第5题
107 How much time does the typical project manager spend communicating (formal and informal)? A. 40% - 60%

B. 30% - 70%

C. 60% - 80%

D. 75% - 90%

E. 25% - 55 %

点击查看答案
第6题
146 The five major cost categories of quality are _____ .

A. prevention, appraisal, internal failures, external failures, and equipment (measurement and test). B. specifications, QA programs, QC programs, parts rejected and parts returned

C. Staffing, Training, reviews, equipment and rejected goods

D. sampling, design considerations, manufacturing considerations, training and rework.

E. None of the above

点击查看答案
第7题
46 Perhaps the biggest problem facing the project manager during integration activities within a matrix structure is:

A. Coping with employees who report to multiple bosses

B. Too much sponsorship involvement

C. Unclear functional understanding of the technical requirements

D. Escalating project costs

E. All of the above

点击查看答案
第8题
55 In a contract, the point of total assumption refers to the point where:

A. The customer incurs the total financial responsibility for each additional dollar spent.

B. The contractor incurs the total financial responsiblity for each dollar spent.

C. The schedule and cost variance are zero.

D. The customer will incur no further costs for the work the contractor performs in the completion of the contract.

E. B and D only

点击查看答案
第9题
103 A contract originated bilaterally may be developed by _____ .

A. quotation request from suppliers

B. proposal request

C. bid invitation release

D. B and C

E. All of the above

点击查看答案
第10题
110 The reason that cost management is so difficult in project management is that:

A. Projects by definition and nature are non-recurring events and are therefore difficult to predict.

B. There are no tools for identifying project tasks.

C. Project managers do not care about tracking costs, as only schedules are important to all project managers.

D. A and B only

E. B and C only

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信