题目内容
(请给出正确答案)
[主观题]
When the precast pile is hit by hammer, the correct method for selecting the pile hammer is ().
A.light hammer and low fight
B.heavy hammer and high fight
C.heavy hammer and low fight
D.light hammer and high fight
提问人:网友lixin080108
发布时间:2022-01-07