题目内容 (请给出正确答案)
[主观题]

Copenhagen Bank Date: 4 January, 2000 To: Bank of China, Beijing We hereby open our Irrevo

Copenhagen Bank

Date: 4 January, 2000

To: Bank of China, Beijing

We hereby open our Irrevocable Letter of Credit NO.112235 in favor of China Trading Corporation for account of Copenhagen Import Company up to an amount of GBP1,455,00 (Say Pounds Sterling One Thousand Four Hundred And Fifty - five Only) for 100% of the invoice value relative to the shipment of:

150 metric tons of Writing Paper Type 501 at GBP97 per m/t CIF Copenhagen as per your S/C No. PO5476 from Copenhagen to China port. Drafts to be drawn at sight on our bank and accompanied by the following documents marked "X":

(X)Commercial Invoice in triplicate

(X) Bill of Lading in triplicate made out to our order quoting L/C No. 112235, marked FREIGHT COLLECT

……

(X) One original Marine Insurance Policy or Certificate for All Risks and War Risk, covering 110% of the invoice value, with claims payable in Copenhagen in the currency of draft(s) Partial shipments and transshipment are prohibited.

Shipment must be effected not later than 31 March, 2000.

This L/C is valid at our counter until 15 April 2000.

附:PO5476号合同主要条款:

卖方:中国贸易公司

买方:哥本哈根进口公司

商品名称:写字纸

规格:501型

数量:150公吨

单价:CIF哥本哈根每公吨97英镑

总值:14,550英镑

装运期:2000年3月31日前自中国港口至哥本哈根

保险:由卖方按发票金额的110%保一切险和战争险

支付:不可撤销的即期信用证,于装运前1个月一到卖方,并于上述装运期后15天内在中国议付有效

提问人:网友happytll 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“Copenhagen Bank Date: 4 Januar…”相关的问题
第1题
Normally, which party signs the contract with a sub-contractor?

A、The Employer

B、The General Contractor

C、The Engineer

D、The Donor

点击查看答案
第2题
According to the author, the two truths to live by is hold fast to life and ____.
点击查看答案
第3题
3. 他确实把真相告诉了你,但你就是不相信。(use the emphatic form of the verb)
点击查看答案
第4题
If both parties are breach of a contract, each party shall bear its respective liability.

A、to

B、at

C、on

D、in

点击查看答案
第5题
The system is described by its impulse response 1) Determine the transfer function H(z) of the system. 2) Determine the ROC of the system. 3) Determine the poles and the zeros of the system, then draw the zero-pole plot
点击查看答案
第6题
We regret to find that your L/C has ______ arrive here within the time linit stipulated.

A、failed

B、to fail

C、failed to

D、failing

点击查看答案
第7题
An L/C should be established ______ our favor.

A、in

B、on

C、at

D、by

点击查看答案
第8题
We advised our bank to ______ L/C No. 889 to read "Partial shipment to be permitted".

A、change

B、amend

C、check

D、correct

点击查看答案
第9题
As requested in Contract No.3245, your company should book the shipping containers ______.

A、be advance

B、advancing

C、for advance

D、in advance

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信