题目内容 (请给出正确答案)
[主观题]

Project scope: Design an information analysis system of type I 项目:设计一款类型I的信息分析系统 或者,了解一款类型I的信息分析系统的应用情况

提问人:网友ddr258 发布时间:2022-01-07
参考答案
  抱歉!暂无答案,正在努力更新中……
如搜索结果不匹配,请 联系老师 获取答案
更多“Project scope: Design an infor…”相关的问题
第1题
123The scope of a project can be expected to change if: A.The project manager must provide

123 The scope of a project can be expected to change if:

A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs

C. The project manager is assigned after the project is defined, and the cost and schedule are approved D. A clear objective is not provided

E. All of the above are possible based upon the situation

点击查看答案
第2题
The scope of a project can be expected to change if:A.The project manager must provide cos

The scope of a project can be expected to change if:

A.The project manager must provide cost estimates without having a design concept

B.Oversimplification (underestimating) of the nature of the work occurs

C.The project manager is assigned after the project is defined, and the cost and schedule are approved

D.A clear objective is not provided

E.All of the above are possible based upon the situation

点击查看答案
第3题
41The scope of a project can be expected to change if: A.The project manager must provide

41 The scope of a project can be expected to change if:

A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs

C. The project manager is assigned after the project is defined, and the cost and schedule are approved

D. A clear objective is not provided

E. All of the above are possible based upon the situation

点击查看答案
第4题
Theanalysisphaseanswersthequestionsofwhowillusethesystem,whatthesystemwilldo,andwhereandwh

The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates ny current system,identifies (71) , and develops a concept for the new system. This phase as three steps: first, (72) is developed to guide the project team's efforts. It usually ncludes an analysis of the current system and its problems, and the ways to design a new ystem. The next step is (73) The analysis ofthis information - in conjunction withinput rom the project sponsor and many other people - leads to the development of a concept for a ew system. The system concept is then used as a basis to develop a set ofbusiness analysis odels that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the (74) necessary to support the nderlying business process. Last, the analyses, system concepts, and models are combined nto a document called the (75), which is presented to the project sponsor and other key ecision makers that decide whether the project should continue to move forward

A.improvementopportunities

B.logicalmodel

C.systemrequirements

D.systemarchitecture@@@SXB@@@A.a user manual

B.an analysis strategy

C. an analysis use case

D.a design user case@@@SXB@@@A.project scope definition

B.prob,lems analysis

C.decisionanalysis

D.requirementsgathering@@@SXB@@@A.dataandprocesses

B.systeminfrastructures

C.externalagents

D.systemsoftware@@@SXB@@@A.requirementsstatement

B.designspecification

C.systemproposal

D.project charter

点击查看答案
第5题
● Information systems design is defined as those tasks that focus on the specification of
a detailed computer-based solution. Typically, there are four systems design tasks for in-house development.

1) The first task is to specify (71) , which defines the technologies to be used by one, more, or all information systems in terms of their data, processes, interfaces, and network components. This task is accomplished by analyzing the data models and process models that are initially created during requirements analysis.

2) The next systems design task is to develop the (72) . The purpose of this task is to prepare technical design specifications for a database that will be adaptable to future requirements and expansion.

3) Once the database prototype has been built, the systems designer can work closely with system users to develop input, output and dialogue specifications. The (73) must be specified to ensure that the outputs are not lost, misrouted, misused, or incomplete.

4) The fourth design task involves packaging all the specifications from the previous design tasks into a set of specifications that will guide the (74) activities during the following phases of the systems development methodology.

Finally, we should (75) and update the project plan accordingly. The key deliverable should include a detailed plan for the construction phase that should follow.

(71)

A. an application architecture

B. a distributed system

C. a system scope

D. a system physical model

(72)

A. database design specifications

B. database organization decisions

C. data structure specifications

D. data distribution decisions

(73)

A. format and layout

B. transaction details

C. additional instructions

D. internal controls

(74)

A. system administrator’s

B. system analyst’s

C. computer programmer’s

D. system designer’s

(75)

A. adjust the project schedule

B. reevaluate project feasibility

C. evaluate vendor proposals

D. select the best vendor proposal

点击查看答案
第6题
试题(71)~(75)The analysis phase answers the questions of who will use the system, what the

试题(71)~(75)

The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates ny current system,identifies (71) , and develops a concept for the new system. This phase as three steps: first, (72) is developed to guide the project team's efforts. It usually ncludes an analysis of the current system and its problems, and the ways to design a new ystem. The next step is (73) The analysis ofthis information - in conjunction withinput rom the project sponsor and many other people - leads to the development of a concept for a ew system. The system concept is then used as a basis to develop a set ofbusiness analysis odels that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the (74) necessary to support the nderlying business process. Last, the analyses, system concepts, and models are combined nto a document called the (75), which is presented to the project sponsor and other key ecision makers that decide whether the project should continue to move forward.

(71) A. improvementopportunities

B. logicalmodel

C. systemrequirements

D. systemarchitecture

(72) A. a user manual

B. an analysis strategy

C. an analysis use case

D. a design user case

(73) A. project scope definition

B. prob,lems analysis

C. decisionanalysis

D. requirementsgathering

(74) A. dataandprocesses

B. systeminfrastructures

C. externalagents

D. systemsoftware

(75) A. requirementsstatement

B. designspecification

C. systemproposal

D. project charter

点击查看答案
第7题
For nearly ten years, the Unified Modeling Language (UML) has been the industry standard f

For nearly ten years, the Unified Modeling Language (UML) has been the industry standard for visualizing, specifying, constructing, and documenting the (71) of a software-intensive system. As the (72) standard modeling language, the UML facilitates communication and reduces confusion among project (73) . The recent standardization of UML 2.0 has further extended the language's scope and viability. Its inherent expressiveness allows users to (74) everything from enterprise information systems and distributed Web-based applications to real-time embedded systems.

The UML is not limited to modeling software. In fact, it is expressive enough to model (75) systems, such as workflow in the legal system, the structure and behavior. of a patient healthcare system, software engineering in aircraft combat systems, and the design of hardware.

To understand the UML, you need to form. a conceptual model of the language, and this requires learning three major elements: the UML's basic building blocks, the rules that dictate how those building blocks may be put together, and some common mechanisms that apply throughout the UML.

A.classes

B.components

C.sequences

D.artifacts

点击查看答案
第8题
______describes,in detail,the project's deliverables and the work required to create those
deliverables.

A.Product scope description

B.Project objectives

C.Stakeholder Analysis

D.The project scope statement

点击查看答案
第9题
● (72)describes, in detail, the project’s deliverables and the work required to create tho
se deliverables.

(72)

A. Product scope description

B. Project objectives

C. Stakeholder Analysis

D. The project scope statement

点击查看答案
第10题
● For nearly ten years, the Unified Modeling Language (UML) has been the industry standard

● For nearly ten years, the Unified Modeling Language (UML) has been the industry standard for visualizing, specifying, constructing, and documenting the (71) of a software-intensive system. As the (72) standard modeling language, the UML facilitates communication and reduces confusion among project (73) . The recent standardization of UML 2.0 has further extended the language's scope and viability. Its inherent expressiveness allows users to (74) everything from enterprise information systems and distributed Web-based applications to real-time embedded systems.

The UML is not limited to modeling software. In fact, it is expressive enough to model (75) systems, such as workflow in the legal system, the structure and behavior. of a patient healthcare system, software engineering in aircraft combat systems, and the design of hardware.

To understand the UML, you need to form. a conceptual model of the language, and this requires learning three major elements: the UML's basic building blocks, the rules that dictate how those building blocks may be put together, and some common mechanisms that apply throughout the UML.

(71)

A. classes

B. components

C. sequences

D. artifacts

(72)

A. real

B. legal

C. de facto

D. illegal

(73)

A. investors

B. developers

C. designers

D. stakeholders

(74)

A. model

B. code

C. test

D. modify

(75)

A. non-hardware

B. non-software

C. hardware

D. software

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信