下列要素中,不属于DFD的是(10)。当使用DFD对一个工资系统进行建模时,(11)可以被认定为外部实体。A.
下列要素中,不属于DFD的是(10)。当使用DFD对一个工资系统进行建模时,(11)可以被认定为外部实体。
A.加35
B.数据流
C.数据存储
D.联系
下列要素中,不属于DFD的是(10)。当使用DFD对一个工资系统进行建模时,(11)可以被认定为外部实体。
A.加35
B.数据流
C.数据存储
D.联系
Estimating schedule activity costs involves developing an(4)of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in mostapplication areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estmates are generally expressed in units of(5)to facilitate comparisions both within and across projects. The(6)describes important information about project requirement that is considered during cost estimating.
A.accuracy
B.approxination
C.specification
D.summary
A.招标人以投标邀请书的方式邀请特定的法人或者其他组织投标
B.发布招标广告吸引或者直接邀请众多投标人参加投标并按照规定程序从中选择中标人的行为
C.招标人以招标公告的方式邀请不特定的法人或者其他组织投标
D.有限招标
A.面向对象设计描述软件要做什么
B.面向对象分析不需要考虑技术和实现层面的细节
C.面向对象分析的输入是面向对象设计的结果
D.面向对象设计的结果是简单的分析模型
A.数据仓库的用户是一线的员工,并且数据仓库的数据应保持不变
B.数据仓库的用户是管理层,并且数据仓库的数据随业务持续增长
C.数据仓库的用户是一线的员工,并且数据仓库的数据随业务持续增长
D.数据仓库的用户是管理层,但数据仓库的数据应保持不变
A.两个或者多个信息系统之间相互访问数据资源
B.企业海量数据的存储和访问
C.企业决策信息的挖掘和提取
D.不同地域的企业信息系统之间进行实时的信息共享和数据通信
A.Controls
B.Baselines
C.Project stakeholders
D.Project managers
A.Project managers
B.Project team members
C.Sponsors
D.Project stakeholders
A.Metrics
B.Measurement
C.Benchmarking
D.Baseline