●Which of the following is not an input to quality planning? (73) .(73) A. scope statement
●Which of the following is not an input to quality planning? (73) .
(73) A. scope statement
B. regulations
C. work results
D. standards
●Which of the following is not an input to quality planning? (73) .
(73) A. scope statement
B. regulations
C. work results
D. standards
A、A. Fish B. Shrimp C. Beans D. Seaweed E. Poultry
B、A. Fish B. Shrimp C. Beans D. Seaweed E. Poultry
C、A. Fish B. Shrimp C. Beans D. Seaweed E. Poultry
D、A. Fish B. Shrimp C. Beans D. Seaweed E. Poultry
E、A. Fish B. Shrimp C. Beans D. Seaweed E. Poultry
A、construction
B、implementation
C、obligation
D、instruction
A、期刊论文
B、会议论文
C、学位论文
D、图书
(74) A. quality planning
B. quality assurance
C. quality performance
D. quality control
(34)A.在软件工程理论领域有所建树的高校教授
B.所在机构上级管理机关相关部门的直属领导
C.具有多年技术经验的项目承建单位总架构师
D.具有同行业同规模相关系统建设经验的高级咨询师
为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!