题目内容 (请给出正确答案)
[主观题]

When activity-based costing is used for environmental accounting, which statement is corre

ct for environment-related costs and environment-driven costs?

A.Environment-related costs can be attributed to joint cost centres and environment-driven costs cannot be

B.Environment-driven costs can be attributed to joint cost centres and environment-related costs cannot be

C.Both environment-related costs and environment-driven costs can be attributed to joint cost centres

D.Neither environment-related costs nor environment-driven costs can be attributed to joint cost centres

提问人:网友gump33 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“When activity-based costing is…”相关的问题
第1题
What concept refers to when firms consider all the costs that can be assigned to the acquisition, use, and maintenance of a purchase?

A、activity-based costing

B、cost trade-offs

C、the systems approach

D、total cost of ownership

点击查看答案
第2题
A variety of tools is available to help the analyst to discover the users&39; true needs.
These tools are grouped into three broad techniques that are based on the degree of change anticipated in the to-be system - Business process()is used when the basic business Requirements outlined in the system request focus on employing computer technology in some aspect of the business process. Two popular activities used in the technique are(). Business process()means that the basic business requirements target moderate changes to the organization&39; s operations. ()are three popular activities in the technique. Business process()means changing the current way of doing business and making major changes to take advantage of new ideas and new technology.

A.automation B.modeling C.improvement D.reengineering A.duration analysis and outcome analysis B.problem analysis and root cause analysis C.technology analysis and activity elimination D.activity-based costing and informal benchmarking A.automation B.modeling C.improvement D.reengineering A.Duration analysis, activity-based costing and informal benchmarking B.Outcome analysis, technology analysis and activity elimination C.Problem analysis, root cause analysis and critical path analysis D.Cost-benefit analysis, schedule analysis and risk analysis A.automation B.modeling C.improvement D.reengineering

点击查看答案
第3题
For activity-based cost systems, activity costs are assigned to products in the proportion of the demand they place on activity resources.
点击查看答案
第4题
Team building involves the following different aspects: ______, _______, ______ and Personality-Based Team building.

A、activity-based

B、skill-based

C、interest-based

D、problem solving-based

点击查看答案
第5题
What is a task-based syllabus or an activity-based syllabus? If you were asked to de

What is a task-based syllabus or an activity-based syllabus? If you were asked to design a task-based syllabus for an English course, what kind of activities would be included in? Give one example and describe your activity.

点击查看答案
第6题
An activity-based costing system is necessary for costing services that are similar.
点击查看答案
第7题
(c) Discuss the practical problems that may be encountered in the implementation of an act

(c) Discuss the practical problems that may be encountered in the implementation of an activity-based system

of product cost management. (5 marks)

点击查看答案
第8题
Which of the followings belong to activity-based team building?

A、mountain climbing

B、personality questionnaire

C、workshop

D、survival course

点击查看答案
第9题
In __________ team building, members of the team fill out a personality questionnaire, whe
re they not only learn about their own personalities, but also learn about the personalities of their fellow team members.

A、activity-based

B、skill-based

C、problem solving-based

D、personality-based

点击查看答案
第10题
The following statements have been made in relation to activity-based costing:(1) A cost d

The following statements have been made in relation to activity-based costing:

(1) A cost driver is a factor which causes a change in the cost of an activity

(2) Traditional absorption costing tends to under-estimate overhead costs for high volume products

Which of the above statements is/are true?

A.1 only

B.2 only

C.Neither 1 nor 2

D.Both 1 and 2

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信