More or less clause allows the seller to deliver goods with tolerance in terms of ().

A.quantity

B.packing

C.quality

D.contract price

提问人:网友sibeichen 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
网友答案
查看全部
  • · 有3位网友选择 A,占比37.5%
  • · 有3位网友选择 C,占比37.5%
  • · 有1位网友选择 B,占比12.5%
  • · 有1位网友选择 D,占比12.5%
匿名网友 选择了C
[83.***.***.105] 1天前
匿名网友 选择了A
[19.***.***.18] 1天前
匿名网友 选择了A
[134.***.***.175] 1天前
匿名网友 选择了C
[164.***.***.38] 1天前
匿名网友 选择了D
[167.***.***.35] 1天前
匿名网友 选择了C
[88.***.***.57] 1天前
匿名网友 选择了B
[190.***.***.191] 1天前
匿名网友 选择了A
[40.***.***.132] 1天前
加载更多
提交我的答案
登录提交答案,可赢取奖励机会。
更多“More or less clause allows the…”相关的问题
第1题
For configuration parameters of a block in Simulink, generally, we can modify the parameters in the window which is given out by double clicking this block.
点击查看答案
第2题
According to the INCOTERMS 2010, the critical point of risk transferring under the CIF term is ( ).

A、On board the vessel at the port of destination

B、Alongside the vessel at the port of destination

C、On board the vessel at the port of shipment

D、Alongside the vessel at the port of shipment

点击查看答案
第3题
Which of the following prices can be quoted for China’s import?

A、USD 15.00 per set CIF Shanghai

B、EUR 15.00 per set FOB Antwerp

C、USD 15.00 per set CIP Dalian, China

D、USD 15.00 per set CIF Antwerp

E、USD 15.00 per set FOB Shanghai

F、USD 15.00 per set CPT Antwerp

点击查看答案
第4题
On February 2, Company A made a selling offer to Company B, "We offer firm at USD 150 per carton FOB Shanghai, subject to your reply here on or before February 10." On February 6, B replied, "Your offer of February 2 is accepted if the price is USD 135 per carton FOB Shanghai." As A was considering, the market price went over USD 150. On February 8, B sent another mail that read, "We accept your offer of February 2." Which of the following statements is true?

A、B’s reply on February 6 is a counteroffer.

B、B’s mail on February 8 is a new offer.

C、No contract was concluded between A and B.

D、B’s reply on February 6 is an acceptance.

E、B’s mail on February 8 is an acceptance.

F、A contract was concluded between A and B.

点击查看答案
第5题
Which of the following quote could be a valid export quote? ( )

A、USD58/PER METRIC TON CIF LONDON

B、USD58/PER METRIC TON FOB LONDON

C、USD58/PER METRIC TON FCA SHANGHAI

D、USD58/PER METRIC TON DAT LONDON

点击查看答案
第6题
Company B sent us a buying offer, subject to our reply there before July 22. On July 24, we telexed our acceptance to the offer but received no reply. As the market kept going up, we unexpectedly received a telex on August 24 from Company B requesting us to make shipment before the end of August as specified in the offer, or they would reserve the right to the claim against us for compensation. Which of the following statements is true?

A、No contract was concluded between B and us.

B、Our acceptance on July 24 was a late acceptance, being invalid without B’s confirmation.

C、B’s telex on August 24 was a new offer, and we could turn it down.

D、B had the right to claim for our late shipment.

E、We should make shipment before the end of August.

F、A contract was concluded between B and us.

点击查看答案
第7题
China’s Company A exported on FCA Shanghai Airport, with shipment during August. A handed over the goods to the airline at Shanghai airport on August 31, and got the Airway Bill on the same day. The goods arrived at the destination on September 2. However, the prevailing market price for wrist watches began to decrease, thus the importer refused to take delivery for A’s late delivery. Which of the following statements is correct?

A、A delivered the goods within contracted time.

B、The importer had to take delivery of the goods.

C、A delivered the goods on September 2. It was late delivery.

D、The importer had the right to refuse to take delivery of the goods.

E、The importer should take delivery of the goods, and then claimed for A’s late delivery.

F、The importer should take delivery of the goods, and then claimed against A for compensation due to the market price decrease.

点击查看答案
第8题
A Chinese company concluded a sale contract for Christmas gifts with a British importer under the CIP term on September 22. Because the Christmas shopping season starts in early November, the Chinese company needs to specify both the latest date of shipment and the latest date of arrival of the goods in the sale contract.
点击查看答案
第9题
In container shipping, FCL cargos usually move from container yard to container yard.
点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信