The scope baseline/project charter is prepared by the:AProject managerBProject manager and

The scope baseline/project charter is prepared by the:

AProject manager

BProject manager and project office

CProject manager, project office and functional team

DProject manager, project office, functional team and project sponsor

EProject manager, project sponsor and customer/user

提问人:网友koffans 发布时间:2022-01-06
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“The scope baseline/project cha…”相关的问题
第1题
QUESTThe scope baseline once established and approved, is used:A.as the basis for making f

QUESTThe scope baseline once established and approved, is used:

A.as the basis for making future decisions.

B.to accomplish verification measures.

C.to evaluate potential changes.

D.All of the above.

E.A and C only.

点击查看答案
第2题
38During project execution, the customer authorizes and funds a scope change which require

38 During project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. The baseline schedule:

A. Now becomes the new schedule, including the changes, and the original baseline is disregarded. B. Is still the original baseline but annotated to reflect that a change has taken place.

C. Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.

D. Is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)

E. Is the same since baseline schedules cannot change once the development phase is completed

点击查看答案
第3题
●The scope baseline once established and approved, is used:Aas the basis for making future

● The scope baseline once established and approved, is used:

A as the basis for making future decisions.

B to accomplish verification measures.

C to evaluate potential changes.

D All of the above.

E A and C only.

点击查看答案
第4题
The preparation of the scope baseline involves the:A.functional mangers。B.project team。C.a

The preparation of the scope baseline involves the:

A.functional mangers。

B.project team。

C.all the stakeholders。

D.project sponsor。

点击查看答案
第5题
96The scope management provides: A.A basis for future decisions about the project. B.A bas

96 The scope management provides:

A. A basis for future decisions about the project.

B. A baseline to accomplish verification measures.

C. A baseline to evaluate potential scope changes.

D. All of the above.

E. B and C only

点击查看答案
第6题
183Configuration (baseline) control monitors performance against the A.scope baseline B.or

183 Configuration (baseline) control monitors performance against the

A. scope baseline

B. original schedule

C. original budget

D. All of the above.

E. None of the above

点击查看答案
第7题
The project scope/charter baseline includes:A.Summary of background conditions defining th

The project scope/charter baseline includes:

A.Summary of background conditions defining the project.

B.Organization, authority and responsibility relationships.

C.Functions to be performed.

D.Resource requirement schedule including time estimates.

E.All of the above.

点击查看答案
第8题
● A project manager believes that modifying the scope of the project may provide added val
ue service for the customer. The project manager should(75).

(75)

A.assign change tasks to project members

B.call a meeting of the configuration control board

C.change the scope baseline

D.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案
第9题
139The scope baseline once established and approved, is used: A.as the basis for making fu

139 The scope baseline once established and approved, is used:

A. as the basis for making future decisions.

B. to accomplish verification measures.

C. to evaluate potential changes.

D. All of the above.

E. A and C only

点击查看答案
第10题
The scope statement providesA.A basis for future decisions about a project.B.A baseline to

The scope statement provides

A . A basis for future decisions about a project.

B . A baseline to accomplish verification measures.

C . A baseline to evaluate potential scope changes.

D . All of the above

E . B and C only

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信