In fixed price contract which of the following holds true?(71) .A.More risk is placed on t

In fixed price contract which of the following holds true?(71) .

A.More risk is placed on the buyer.

B.If the amount of the contract is exceeded the seller is not obligated to perform. further unless the buyer increases the funds.

C.The seller agrees to perform. a service or furnish supplies at the established contract price.

D.The seller agrees to use his best effort to fulfill the contract within the estimated contract amount.

提问人:网友angleverge 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“In fixed price contract which …”相关的问题
第1题
Industrial fermentation refers to the use of microorganisms to make fermentation.
点击查看答案
第2题
is the process of obtaining the stakeholdrs’formal acceptance of the completed project scope. Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.

A.scope definition

B.WBS Creation

C.project acceptance

D.scope verification

点击查看答案
第3题
On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating. Activity duration estimating and(74) are so tightly linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.

A.project planning

B.schedule development

C.cost estimating

D.time estimating

点击查看答案
第4题
经济计量分析的工作程序依次是(69)。

A.设定模型、检验模型、估计模型、改进模型

B.设定模型、估计参数、检验模型、应用模型

C.估计模型、应用模型、检验模型、改进模型

D.搜集资料、设定模型、估计参数、应用模型

点击查看答案
第5题
超出项目经理控制的成本增加因素,除了存款利率、贷款利息和税率外,还包括(70)。

A.项目日常开支的速度和生产率

B.项目日常开支的速度和工期拖延

C.项目补贴和加班

D.原材料成本和运输成本

点击查看答案
第6题
螺旋模型是一种演进式的软件过程模型,结合了原型开发方法的系统性和瀑布模型可控性特点。它有两个显著特点,一是采用(46)的方式逐步加深系统定义和实现的深度,降低风险:二是确定一系列(47),确保项目开发过程中的相关利益者都支持可行的和令人满意的系统解决方案

A.逐步交付

B.顺序

C.循环

D.增量

点击查看答案
第7题
关键路径法是多种项目进度分析方法的基础。(52)将关键路径法分析的结果应用到项目日程表中;(53)是关键路径法的延伸,为项目实施过程中引入活动持续期的变化。

A.PERT网络分析

B.甘特图

C.优先日程图法

D.启发式分析法

点击查看答案
第8题
软件质量强调三个方面的内容:(48)是测试软件质量的基础;(49)定义了一组用于指导软件开发方式的准则;(50)间接定义了用户对某些特性的需求。

A.软件需求

B.软件分析

C.软件设计

D.软件实现

点击查看答案
第9题
Many of the activities performed during the preliminary investigation are still being conducted in (71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the (72) and must develop enough knowledge about the (73) and the existing systems to enable an effective solution to be proposed and implementeD. Besides the (74) for process and data of current system, the deliverable from this phase also includes the (75) for the proposed system.

A.analysis phase

B.design phase

C.implementation phase

D.maintenance phase

点击查看答案
第10题
下列接入网类型和相关技术的术语中,对应关系错误的是______。

A.ADSL——对称数字用户环路

B.PON——无源光网络

C.CDMA——码分多址

D.VDSL——甚高速数字用户环路

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信