题目内容 (请给出正确答案)
[主观题]

10On a precedence diagram, the arrow between two boxes is called: A.An activity. B.A const

10 On a precedence diagram, the arrow between two boxes is called:

A. An activity.

B. A constraint.

C. An event.

D. The critical path.

E. None of above

提问人:网友wuhuqq 发布时间:2022-01-06
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“10On a precedence diagram, the…”相关的问题
第1题
已知墨卡托海图上10ºN纬线到赤道的子午线图长为599.1mm,10ºN纬线上1ˊ经差的图长为1mm,则10ºN的纬度渐长率MP为:

A.59.91

B.599.1mm

C.599.1

D.无法计算

点击查看答案
第2题
In the United States what lies ahead usually takes precedence over the past.
点击查看答案
第3题
QOS中Precedence Classes分为哪些等级?()

A.High priority

B.Low priority

C.Normal priority

D.Middle priority

点击查看答案
第4题
● Precedence Diagramming Method (PDM) is a method used in activity sequencing. There are f

● Precedence Diagramming Method (PDM) is a method used in activity sequencing. There are four types of dependencies or precedence relationships in PDM. The initiation of the successor activity depends upon the completion of the predecessor activity is called __(75)__.

(75)

A.Finish-to-Start

B.Finish-to-Finish

C.Start-to-Start

D.Start-to-Finish

点击查看答案
第5题
In the early days of the United States, loyalty to one’s state often took precedence over loyalty to one’s country.
点击查看答案
第6题
PDM includes four types of dependencies or precedence relationships: ...(18). The completi

PDM includes four types of dependencies or precedence relationships: ...(18). The completion of the successor activity depends upon the initiation of the predecessor activity.

A.Finish-to-Start

B.Finish-to-Finish

C.Start-to-Start

D.Start-to-Finish

点击查看答案
第7题
某些HW网络设备上计划使用DSCP信息来部署QOS。在不同选项的比较中,下面哪个选项描述是正确的?()

A.IP Precedence 和 DSCP 没有重叠的部分

B.DSCP 仅用于 TCP.IP Precedence 仅用于 UDP

C.DSCP 与 IP Precedence 完全相同.名称的改变仅仅是营销命名的惯例

D.DSCP 最后 2 位与 IP Precedence 重叠

E.DSCP 的 CS 向后兼容 IP Precedence

点击查看答案
第8题
PDM includes four types of dependencies or precedence relation ships:(73)The completion of

PDM includes four types of dependencies or precedence relation ships:(73)The completion of the successor activity depends upon the initiation of the predecessor activity.

A.Finish-to-Start

B.Finish-to-Finish

C.Start-to-Start

D.Start-to-Finish

点击查看答案
第9题
128On a precedence diagram, the arrow between two boxes is called: A.An activity. B.A cons

128 On a precedence diagram, the arrow between two boxes is called:

A. An activity.

B. A constraint. C. An event.

D. The critical path.

E. None of above

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信