题目内容 (请给出正确答案)
[主观题]

171One of your project team members has made a technological breakthrough on an R & D

171 One of your project team members has made a technological breakthrough on an R & D project. The result will be new business for the company, as well as a company patent. The team member received a company bonus. The motivational strategy used here is:

A. Job enrichment

B. Linking pay and performance

C. Behavior. modification

D. Freedom in the work place

E. All of the above

提问人:网友lovemyqq 发布时间:2022-01-06
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“171One of your project team me…”相关的问题
第1题
打开一个已有项目文件的命令是______。A.OPEN PROJECTB.MODIFY PROJECTC.USE PROJECTD.EDIT PROJE

打开一个已有项目文件的命令是______。

A.OPEN PROJECT

B.MODIFY PROJECT

C.USE PROJECT

D.EDIT PROJECT

点击查看答案
第2题
101The lowest dollar amount 'at stake' is associated with the following phase of the proje

101 The lowest dollar amount 'at stake' is associated with the following phase of the project: A. conceptual

B. execution

C. cut-over

D. post project evaluation

E. A and D only

点击查看答案
第3题
According to the news item, the "talking kitchen" can______.A.develop French digital proje

According to the news item, the "talking kitchen" can______.

A.develop French digital projects

B.guide cars on roads through instructions in French

C.work with researchers on Skype

D.teach students how to cook French and speak French

点击查看答案
第4题
A.A projector and a wireless microphone.B.A PowerPoint projector and an overhead proje

A.A projector and a wireless microphone.

B.A PowerPoint projector and an overhead projector.

C.A projector and a microphone on the podium.

D.A wireless microphone and a microphone on the podium.

点击查看答案
第5题
183The lowest dollar amount 'at stake' is associated with the following phase of the proje

183 The lowest dollar amount 'at stake' is associated with the following phase of the project: A. conceptual

B. execution

C. cut-over

D. post project evaluation

E. A and D only

点击查看答案
第6题
79Which of the following planning considerations is often overlooked? A.Planning for proje

79 Which of the following planning considerations is often overlooked?

A. Planning for project termination.

B. Qualified project manager assignment.

C. Insuring top management support.

D. Clearly defined tasks.

E. All of the above

点击查看答案
第7题
听力原文:W: Are you coming with me to the art show?M: No, I' m too busy with another proje

听力原文:W: Are you coming with me to the art show?

M: No, I' m too busy with another project.

What does the man mean?

A.He must hand in a full report on the exhibition.

B.He is too busy to go along.

C.He has to wash his hands first.

D.He has already seen the show.

点击查看答案
第8题
The project life-cycle can be described as (72).A.project concept, project planning, proje

The project life-cycle can be described as (72).

A.project concept, project planning, project execution, and project close-out

B.project planning, work authorization, and project reporting

C.project planning, project control, project definition, WBS development, and project termination

D.project concept, project execution, and project reporting

点击查看答案
第9题
The schedule risk is the _____ .Athe accumulated "expected' durations which maintain proje

The schedule risk is the _____ .

A the accumulated "expected' durations which maintain project completion.

B Critical Path adjusted by "high-risk" activity float.

C highest risk path that maintains quality.

D Critical Path when calculated with "most likely" duration.

E highest risk path that contributes the most risk toward the project completion.

点击查看答案
第10题
I am () of your success in your job.
点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信