题目内容 (请给出正确答案)
[主观题]

During the risk analysis process, it is determined that one identified risk event cannot b

e avoided, mitigated, or insured. This risk event is a critical item that could cause the project to fail if it occurs. The best option for the project manager is to: (73).

A.Continue to search for an insurance company that would assume the risk

B.Place special emphasis on the risk event to intensely manage that item and all interfacing items

C.Play down the risk and the team will find a means of overcoming any failure

D.Ignore the risk assessment because any assigned value is a point estimate which is never precisely the expected state of nature

提问人:网友Kenyin 发布时间:2022-01-07
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“During the risk analysis proce…”相关的问题
第1题
157Sensitivity analysis can be used in risk analysis to: A.Substitute for uncertainty anal

157 Sensitivity analysis can be used in risk analysis to:

A. Substitute for uncertainty analysis in risk quantification

B. estimate the level of risk aversion adopted by management

C. estimate the effect of change of one project variable on the overall project

D. A and B

E. All of the above

点击查看答案
第2题
The midgut loop normally herniates through the primitive umbilical ring into the extraembr
yonic coelom during week 6 of development. Failure of the intestinal loops to return to the abdominal cavity by week 10 results in the formation of

A、congenital umbilical hernia

B、anal agenesis

C、ileal diverticulum

D、intestinal stenosis

点击查看答案
第3题
There is a big risk of getting infected during open-mouth kissing.A.YB.NC.NG

There is a big risk of getting infected during open-mouth kissing.

A.Y

B.N

C.NG

点击查看答案
第4题
The()bears the risk of loss during transportation in a destination contract.

A.buyer

B.seller

C.carrier

D.shipper

点击查看答案
第5题
Under CIP,the seller procures insurance against his own risk of loss of or damage
to the goods during the carriage.()

点击查看答案
第6题
What is the name of a risk category associated with a scenario in which a requirement is likely to keep changing or evolving during the development process?
点击查看答案
第7题
The employees tried to avoid every risk that might ______ her displeasure during the first
month after she was divorced by her husband.

A.indebt

B.indicate

C.incur

D.incline

点击查看答案
第8题
Teenagers whose parents smoke are at risk of getting lung cancer at some time during their
lives.

A.Y

B.N

C.NG

点击查看答案
第9题
However, the seller also has to Procure insurance against the buyer’s risk of los
s or damage to the goods during the carriage.Consequently,the seller contracts for insurance and pays the insurance premium

点击查看答案
第10题
Risk management allows the project manager and the project team not to(71). A.eliminate

Risk management allows the project manager and the project team not to(71). A.eliminate most risks during the planning phase of the project B.identify project risks C.identify impacts of various risks D.plan suitable responses

点击查看答案
第11题
● Risk management allows the project manager and the project team not to(71). (71)A.elimin

● Risk management allows the project manager and the project team not to(71).

(71)

A.eliminate most risks during the planning phase of the project

B.identify project risks

C.identify impacts of various risks

D.plan suitable responses

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信