Using the WBS in the Special window, an instance of a work package is:A.Build houseB.Excav

Using the WBS in the Special window, an instance of a work package is:

A.Build house

B.Excavate

C.Prepare Foundation

D.B and C

E.None of the above

提问人:网友fireabe 发布时间:2022-01-06
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“Using the WBS in the Special w…”相关的问题
第1题
142Which of the following can be tracked using the WBS? A.time B.cost C.performance D.scop

142 Which of the following can be tracked using the WBS?

A. time

B. cost

C. performance

D. scope

E. None of the above

点击查看答案
第2题
Which of the following can be tracked using the WBS?A.timeB.costC.performanceD.scopeE.None

Which of the following can be tracked using the WBS?

A.time

B.cost

C.performance

D.scope

E.None of the above.

点击查看答案
第3题
60Which of the following can be tracked using the WBS? A.time B.cost C.performance D.scope

60 Which of the following can be tracked using the WBS?

A. time

B. cost

C. performance

D. scope

E. None of the above

点击查看答案
第4题
Using the situation stated in the Special window, the cost performance index (CPI) for WBS

Using the situation stated in the Special window, the cost performance index (CPI) for WBS Element R is:

A . 0.875

B . 1.14

C . 0.952

D . 0.833

E . 1.2

点击查看答案
第5题
Using the WBS shown in the Special window, a typical work package would be:ASoftware devel

Using the WBS shown in the Special window, a typical work package would be:

ASoftware development

BSystems design

CCoding

DA, B, and C

ENone of the above.

点击查看答案
第6题
101Parametric cost estimating involves A.using the WBS to do bottom up estimates B.definin

101 Parametric cost estimating involves

A. using the WBS to do bottom up estimates

B. defining the perimeters of the life-cycle

C. calculating the individual estimates of work packages

D. using a statistical model to estimate costs

E. A and C

点击查看答案
第7题
19Parametric cost estimating involves A.using the WBS to do bottom up estimates B.defining

19 Parametric cost estimating involves

A. using the WBS to do bottom up estimates

B. defining the perimeters of the life-cycle

C. calculating the individual estimates of work packages

D. using a statistical model to estimate costs

E. A and C

点击查看答案
第8题
3Using the WBS in the Special window, an instance of a work package is: A.Build house B.Ex

3 Using the WBS in the Special window, an instance of a work package is:

A. Build house

B. Excavate

C. Prepare Foundation

D. B and C

E. None of the above

点击查看答案
第9题
105Using the situation stated in the Special window, WBS Element Q is _____ budget by ____

105 Using the situation stated in the Special window, WBS Element Q is _____ budget by _____ percent.

A. Over, 16.66

B. Under, 16.66

C. Over, 10.0

D. Under, 10.0

E. None of the above

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信