题目内容 (请给出正确答案)
[主观题]

81A project manager believes that the best way to manage is to form. a good, harmonious wo

81 A project manager believes that the best way to manage is to form. a good, harmonious working relationship with the team, and high performance will follow. The project manager could be defined as a _____ manager.

A. 1,9

B. 9,1

C. 1,1

D. 9,9

E. 5,5

提问人:网友hyg1978 发布时间:2022-01-06
参考答案
查看官方参考答案
如搜索结果不匹配,请 联系老师 获取答案
更多“81A project manager believes t…”相关的问题
第1题
The project manager told him that the vacancy
点击查看答案
第2题
The scope baseline/project charter is prepared by the:AProject managerBProject manager and

The scope baseline/project charter is prepared by the:

AProject manager

BProject manager and project office

CProject manager, project office and functional team

DProject manager, project office, functional team and project sponsor

EProject manager, project sponsor and customer/user

点击查看答案
第3题
The contracting function in an organization is considered to be decentralized when ()

The contracting function in an organization is considered to be decentralized when ()

A.Each project manager has control over the contracting process for his or her project

B.The project manager controls contract award

C.The contracting person appointed to the project is available and under the project manager's direct control

D.Contracting is tailored to a single project

E.All above

点击查看答案
第4题
92The main player in project communication is the A.sponsor B.project manager C.functional

92 The main player in project communication is the

A. sponsor

B. project manager

C. functional manager

D. functional team

E. All of the above

点击查看答案
第5题
The(70)provides the project manager with the authority to apply organizational resources t

The(70)provides the project manager with the authority to apply organizational resources to project activities.

A.project management plan

B.contract

C.project human resource plan

D.project charter

点击查看答案
第6题
What information does a control chart provide to a project manager?A.Indicates the need fo

What information does a control chart provide to a project manager?

A.Indicates the need for variance analysis.

B.Illustrates how a process behanves over tim

C.Helps a project manager to change the project scop

D.Identifies the project risks.

点击查看答案
第7题
93When a project manager is running over the budgeted costs, the project manager can typic

93 When a project manager is running over the budgeted costs, the project manager can typically _____ to attempt to get the project back on budget.

A. Reduce features and/or functionality

B. Increase risk.

C. Incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)

D. All of the above.

E. A and B only

点击查看答案
第8题
100Interfacing with the customer after project go-ahead is the responsibility of: A.Projec

100 Interfacing with the customer after project go-ahead is the responsibility of:

A. Project sponsor

B. Project team

C. Project manager

D. Functional manager

E. All of the above are possible, based upon the size and complexity of the project

点击查看答案
第9题
121The quality objectives are approved in the conceptual stage of the project by the: A.Pr

121 The quality objectives are approved in the conceptual stage of the project by the:

A. Project Engineer

B. Project Manager

C. Functional Manager

D. Quality Assurance Manager

E. Project Owner

点击查看答案
第10题
______by the failure of the project, the manager could hardly say a word.A.To be shockedB.

______by the failure of the project, the manager could hardly say a word.

A.To be shocked

B.Shocked

C.Be shocked

D.Shocking

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信