题目内容 (请给出正确答案)
[主观题]

The Primary unknowns in the force method are ___________.

提问人:网友cao_shan 发布时间:2022-01-06
参考答案
  抱歉!暂无答案,正在努力更新中……
如搜索结果不匹配,请 联系老师 获取答案
更多“The Primary unknowns in the fo…”相关的问题
第1题
In the slope-deflection method, the primary unknowns come from ____________.

A、joint rotations

B、translations

C、joint rotations and translations

D、none of the above

点击查看答案
第2题
In the slope-deflection method, the primary unknowns come from ____________.

A、joint rotations and translations

B、joint rotations

C、translations

D、none of the above

点击查看答案
第3题
If there are two basic unknowns when a structure is solved using displacement method, it is an indeterminate structure with two degrees of indeterminacy.
点击查看答案
第4题
158Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluate

158 Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated): A. should be deflected to the contracting officer

B. should be handled via contingency allowances

C. should be ignored, since they cannot be identified

D. should be ignored, since they are not covered in the Project Risk Assessment

E. C and D

点击查看答案
第5题
7 these unknowns helps people become more comfortable with making bold choices in life.

A.testimonies

B.removing

C.shape

D.balance

点击查看答案
第6题
Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated):

Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated):

A should be deflected to the contracting officer

B should be handled via contingency allowances

C should be ignored, since they cannot be identified

D should be ignored, since they are not covered in the Project Risk Assessment

E C and D

点击查看答案
第7题
neglecting the axial deformation of the given structure, the minimum number of basic unknowns for displacement method is:

Neglecting the axial deformation of the given structure, the minimum number of basic unknowns for displacement method is:

A、2

B、3

C、4

D、5

点击查看答案
第8题
76Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated

76 Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated): A. should be deflected to the contracting officer

B. should be handled via contingency allowances

C. should be ignored, since they cannot be identified

D. should be ignored, since they are not covered in the Project Risk Assessment

E. C and D

点击查看答案
第9题
在靠近河边的某建筑工地,洪水毁坏了所有的挖掘的地基,这是发生在什么类型的风险? ()A 已知风

在靠近河边的某建筑工地,洪水毁坏了所有的挖掘的地基,这是发生在什么类型的风险? ()

A 已知风险(Known knowns)

B 可预测风险(Known unknowns)

C 不可预测风险(unknwn unknowns)

D 其他

点击查看答案
账号:
你好,尊敬的用户
复制账号
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
欢迎分享答案

为鼓励登录用户提交答案,简答题每个月将会抽取一批参与作答的用户给予奖励,具体奖励活动请关注官方微信公众号:简答题

简答题官方微信公众号

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“简答题”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
简答题
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反简答题购买须知被冻结。您可在“简答题”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
简答题
点击打开微信